No. 1 Blast Furnace at the Wakayama Steel Works
The Wakayama Steel Works No. 1 coke oven and No. 1 blast furnace were installed in fiscal 2009. At the same time, CDQ, TRT, and other large-size energy-saving equipment also began operating, resulting in a reduction in CO
2 emissions of approximately 130,000 tons per year.
Click here